CONSTRUCTION

DAWSON is a Native Hawaiian Organization (NHO) 8(a) Small Business
with Strategic Locations Throughout CONUS, the Pacific Rim and Worldwide

General & Secured
Construction

Fuels
Construction

Executive Director – Construction
Tom Coffey, P.E.
832.867.4748
tcoffey@dawsonohana.com

GENERAL & SECURED
CONSTRUCTION

Federal & Commerical Facilities & Infrastructure

With almost 30 years of demonstrated Design-Build and Design-Bid-Build construction experience, DAWSON is a leader in Federal Construction. We have the proven capabilities, established contract vehicles, vendor and supplier relationships, and in-place processes to deliver cost-effective and timely solutions to our Federal and commercial customers’ construction needs.

With a focus on Secured facilities and infrastructure, DAWSON brings demonstrated experience to understanding the constraints and challenges that Secured facility owners face in maintaining assets or constructing new facilities to support their evolving missions.

We fully understand the processes and procedures for completing work in a Secured environment and have worked on multiple contracts and projects operating in cleared facilities with varying degrees of security.

KEY PROJECT EXPERIENCE
Repair of 6th floor soffit at bldg 700

Location: USINDOPACOM HQ, Camp Smith, Honolulu, HI

Client: Naval Facilities Engineering Command (NAVFAC) Hawaii

Scope: DAWSON provided emergency roof repairs at USINDOPACOM Headquarters after wind and water damage caused by hurricane-related storms. Work included emergency response and assessment, roof repair, structural assessment, scaffolding design, crane operations, fall protection safety, framing, flashing, and waterproofing; design and correction of roofing underlay design to mitigate future degradation.

Waiawa Transmission Main Emergency Repair

Location: Waiawa, Honolulu, HI

Client: Naval Facilities Engineering Command (NAVFAC) Hawaii

Scope: DAWSON provided emergency response and repair of a 42-inch water main that provides 70% of the fresh water supplied to Pearl Harbor and Navy Properties. Work included excavation and dewatering, installing shoring, engineering and installing repair coupling, installing new piping and coupling, and backfill and compaction. Repair work was completed within a time-critical 7-day window. Crews worked safely and expeditiously around the clock in order to repair this critical infrastructure for our client.

Eglin SABER Contract

Location: Eglin Air Force Base, FL

Client: 96th Civil Engineer Group

Scope: DAWSON provided a broad range of construction in support of base engineering requirements to include maintenance, repair, and minor and new construction work at Eglin AFB and its associated sites in Florida. Individual project scopes vary from small renovations to large-scale infrastructure needs and life safety issues.

MPC Secured facility renovation at b1025

Location: Beale Air Force Base, CA

Client: 99th Reconnaissance Squadron

Scope: DAWSON designed and renovated the existing Mission Planning Cell (MPC) Operations Center​ to meet current Secured facility requirements to include the replacement of walls, ceilings, doors, electrical, and mechanical components to meet ICD 705 standards. Scope also included a new, second story, steel mezzanine structure and HVAC upgrades to accommodate the additional workspace. 

EGLIN LRSO

Location: Eglin Air Force Base, FL

Client: Air Force Test Center, Operational Contracting Division, Base Operating Support Branch

Scope: DAWSON designed and constructed five pre-engineered, temporary modular buildings​ in support of Eglin AFB. Each temporary modular building will have their own unique set of​ requirements to include a Secured facility, general office, administrative spaces, and a conference center. 

AFWET SITE PREP FOR MET

Location: Thule Air Base, Greenland

Client: Air Force Wideband Enterprise Terminal

Scope: DAWSON designed and constructed a new SATCOM facility for the Modernization of Enterprise​ Terminals (MET) program. This new construction project was built from the ground up to​ include geotechnical survey, site prep, foundation, and structural components for a new 68-foot radome along with a new utilidor to connect the facility to existing infrastructure. Due​ to the environmental conditions, the project was completed in two separate phases with the​ radome installation and leak test completed in 45 days during the summer season.

CONTACT US

Christopher Ackert, P.E.
Director of Construction – East
317.995.0653
cackert@dawsonohana.com

Tom Coffey, P.E.
Director of Construction – West
832.867.4748
tcoffey@dawsonohana.com

Michael Fonseca
General Manager – Pacific
808.286.5512
mfonseca@dawsonohana.com

FEATURED PROJECTS

FUELS CONSTRUCTION

Federal Fuels Facilities & Infrastructure

Our integrated service offering includes construction, operations/maintenance, and engineering/planning on fuel facilities and infrastructure to maintain operational capability, mission readiness, and environmental compliance.

Our Fuels Team includes a range of in-house subject matter experts focused on providing best-in-class services to the DoD petroleum logistics community.

KEY PROJECT EXPERIENCE

Emergency Fuel System Repairs

Location: Offutt AFB, NE

Client: USACE Omaha District

Scope: At Offutt AFB in Omaha NE, DAWSON completed emergency repairs of the Type III hydrant system damaged by flood waters. DAWSON installed new pumps and motors, a pump control panel, motor control center, and rebuilt 38 control valves along with PRT coating repairs.

API 653 Tank Inspections & Repairs

Location: Scott AFB, IL; Meridian, MS; NAB Little Creek, VA; PMRF Barking Sands, HI; Dyess AFB, TX; NSB New London, CT; NAF El Centro, CA; MCAB Kaneohe Bay, HI; MCAS Cherry Point, NC; FLC Norfolk, VA; and FLC Manchester, VA

Client: U.S. Air Force and Navy

Scope: At DoD installations through the DLA Energy SRM program, DAWSON performed multiple concurrent fuel storage API 653 tank inspection/repair projects from installing a new floor to complete coating replacement at multiple locations without disruption to mission operations.

Repairs to Issue Line

Location: Mountain Home AFB, ID

Client: USACE Omaha District

Scope: This time sensitive project included repairs to replace three underground pipelines constructed in the mid 1950’s to include the bulk storage issue line with pump header, pipeline receipt header, new tank truck offloading receipt pipeline header and replumbing the slop tank return line to the new type III product recovery tank. To accommodate new stainless steel piping DAWSON installed two roadway trenches with drain lines for positive drainage within the trench systems. To allow the base to utilize the bulk storage tanks during the construction phase of the project DAWSON’s Fuels Team mobilized within 5 days of contract award to install a 600 GPM pump and associated hoses to sustain transfer operations to support the Wings flying mission.

CONTACT US

Cleburne Bernhard
Senior Program Manager – Fuels
210.393.5069
cbernhard@dawsonohana.com

Steven Oakes
Corporate QC Manager – Fuels
989.627.8688
soakes@dawsonohana.com

FEATURED PROJECTS

CONTACT US
To learn more about our innovative Construction solutions and capabilities, or to discuss a contract/teaming opportunity, please contact one of our team members:

Leadership


Tom Coffey, P.E.
Executive Director – Construction
832.867.4748
tcoffey@dawsonohana.com

CONSTRUCTION


Christopher Ackert, P.E.
Director of Construction – East
317.995.0653
cackert@dawsonohana.com

Tom Coffey, P.E.
Director of Construction – West
832.867.4748
tcoffey@dawsonohana.com

Michael Fonseca
General Manager – Pacific
808.286.5512
mfonseca@dawsonohana.com

Fuels Construction


Cleburne Bernhard
Senior Program Manager – Fuels
210.393.5069
cbernhard@dawsonohana.com

Steven Oakes
Corporate QC Manager – Fuels
989.627.8688
soakes@dawsonohana.com